11.3Wyndham Street North and St. George's Square - Preparing for and mitigating construction (DTIRP Phase 1) - 2025-303
Main Motion
Moved by Downer · Seconded by Busuttil
- That the Downtown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the sequencing plan for Phase 1: Wyndham Street North Reconstruction including extended working hours, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the recommended Concept Plan for St. George’s Square, as outlined in report 2025-303, dated July 8, 2025, be approved including the following:
- That staff be encouraged to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events, including but not limited to:
- Consider that site furniture such as benches, chairs, and waste receptacles are designed and located to allow for east reconfiguration or temporary removal to accommodate different uses and events.
- That staff be encouraged to integrate more natural materials and design elements that reflect the heritage and character of our downtown into the final design of St. George's Square including but not limited to:
- Use of stone, wood, or other natural finishes where feasible; including the use of the limestone in the city’s salvaged material storage,
- Incorporation of heritage-inspired features such as: signage or art that shares local history and indigenous stories, gateway features such as low stone walls, or planters that tie the space to the downtown's historical context, planting and landscaping with native species and that soften hard surfaces, brick or stone paving patterns that reflect traditional streetscape.
- That staff provide council with final design updates (including a new main design image that can be used when sharing and telling the good news story about the redesign of our downtown) and present design details through future public engagement and online resources before the end of 2025.
- That staff report back on budget impacts, if applicable, associated with clauses 1 and 2, via either the 2026 budget monitoring process or the 2027 budget update.
- That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the delegation of authority by-law, By-law (2024) – 20994, be amended to delegate authority to the DCAO of Infrastructure, Development and Environment, with written approval from the City Treasurer, to modify the following user fees at various times as needed for the duration of the Downtown Infrastructure Renewal Program, with lost revenue being funded through the construction mitigation budget for the Downtown Infrastructure Renewal Program:
- Seasonal patio program parking stall rental fees
- Downtown hourly parking fees
- Encroachment agreement fees related to the Downtown Infrastructure Renewal Program
- That an amending by-law be brought forward for approval at the July 22, 2025, City Council meeting.
- And wherever possible, the sidewalk height and slope should be raised to increase front door accessibility to buildings.
Amendment to Clause 3 of Main MotionCarried (9 to 3)
Moved by Klassen · Seconded by Goller
That clause 3 of the main motion, be amended to replace the word encouraged with directed.
For (9): Mayor Guthrie, Goller, Allt, Downer, Caron, Klassen, Richardson, Busuttil, Chew
Against (3): Gibson, Billings, Caton
Main Motion, as Amended
Moved by Downer · Seconded by Busuttil
- That the Downtown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the sequencing plan for Phase 1: Wyndham Street North Reconstruction including extended working hours, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the recommended Concept Plan for St. George’s Square, as outlined in report 2025-303, dated July 8, 2025, be approved including the following:
- That staff be directed to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events, including but not limited to:
- Consider that site furniture such as benches, chairs, and waste receptacles are designed and located to allow for east reconfiguration or temporary removal to accommodate different uses and events.
- That staff be directed to integrate more natural materials and design elements that reflect the heritage and character of our downtown into the final design of St. George's Square including but not limited to:
- Use of stone, wood, or other natural finishes where feasible; including the use of the limestone in the city’s salvaged material storage,
- Incorporation of heritage-inspired features such as: signage or art that shares local history and indigenous stories, gateway features such as low stone walls, or planters that tie the space to the downtown's historical context, planting and landscaping with native species and that soften hard surfaces, brick or stone paving patterns that reflect traditional streetscape.
- That staff provide council with final design updates (including a new main design image that can be used when sharing and telling the good news story about the redesign of our downtown) and present design details through future public engagement and online resources before the end of 2025.
- That staff report back on budget impacts, if applicable, associated with clauses 1 and 2, via either the 2026 budget monitoring process or the 2027 budget update.
- That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the delegation of authority by-law, By-law (2024) – 20994, be amended to delegate authority to the DCAO of Infrastructure, Development and Environment, with written approval from the City Treasurer, to modify the following user fees at various times as needed for the duration of the Downtown Infrastructure Renewal Program, with lost revenue being funded through the construction mitigation budget for the Downtown Infrastructure Renewal Program:
- Seasonal patio program parking stall rental fees
- Downtown hourly parking fees
- Encroachment agreement fees related to the Downtown Infrastructure Renewal Program
- That an amending by-law be brought forward for approval at the July 22, 2025, City Council meeting.
- And wherever possible, the sidewalk height and slope should be raised to increase front door accessibility to buildings.
Second Amendment to Main Motion
Moved by Downer · Seconded by Klassen
- That the size of the area for play be reduced to include an interactive placemaking structure, and minimum safety clearance zones as defined by the Canadian Standards Association (CSA), in order to increase flexibility for programming and events within St. George's Square.
- That staff explore the inclusion of placemaking lighting within the design of the pavers or through the use of projectors throughout St. George’s Square including enhancing the proposed interactive placemaking structure.
- That staff explore modifying the size and materiality of the lower basin of the Family Fountain so that it is consistent with the design of St. George's Square, accommodates off-season intervention that contributes aesthetically to St. George's Square, includes placemaking lighting, and honours the integrity of the artwork.
- That the final design for St. George's Square be brought forward for Council approval by the end of 2025.
This motion was requested to be voted on separately.
Clause 1 of Second Amendment to Main MotionCarried (12 to 0)
Moved by Downer · Seconded by Klassen
- That the size of the area for play be reduced to include an interactive placemaking structure, and minimum safety clearance zones as defined by the Canadian Standards Association (CSA), in order to increase flexibility for programming and events within St. George's Square.
For (12): Mayor Guthrie, Gibson, Goller, Allt, Downer, Billings, Caron, Caton, Klassen, Richardson, Busuttil, Chew
Clause 2 of Second Amendment to Main MotionCarried (12 to 0)
Moved by Downer · Seconded by Klassen
2. That staff explore the inclusion of placemaking lighting within the design of the pavers or through the use of projectors throughout St. George’s Square including enhancing the proposed interactive placemaking structure.
For (12): Mayor Guthrie, Gibson, Goller, Allt, Downer, Billings, Caron, Caton, Klassen, Richardson, Busuttil, Chew
Clause 3 of Second Amendment to Main MotionCarried (12 to 0)
Moved by Downer · Seconded by Klassen
3. That staff explore modifying the size and materiality of the lower basin of the Family Fountain so that it is consistent with the design of St. George's Square, accommodates off-season intervention that contributes aesthetically to St. George's Square, includes placemaking lighting, and honours the integrity of the artwork.
For (12): Mayor Guthrie, Gibson, Goller, Allt, Downer, Billings, Caron, Caton, Klassen, Richardson, Busuttil, Chew
Clause 4 of Second Amendment to Main MotionCarried (12 to 0)
Moved by Downer · Seconded by Klassen
4. That the final design for St. George's Square be brought forward for Council approval by the end of 2025.
For (12): Mayor Guthrie, Gibson, Goller, Allt, Downer, Billings, Caron, Caton, Klassen, Richardson, Busuttil, Chew
Main Motion, as amended
Moved by Downer · Seconded by Busuttil
- That the Downtown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the sequencing plan for Phase 1: Wyndham Street North Reconstruction including extended working hours, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the recommended Concept Plan for St. George’s Square, as outlined in report 2025-303, dated July 8, 2025, be approved including the following:
- That staff be directed to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events, including but not limited to:
- Consider that site furniture such as benches, chairs, and waste receptacles are designed and located to allow for easy reconfiguration or temporary removal to accommodate different uses and events.
- That staff be directed to integrate more natural materials and design elements that reflect the heritage and character of our downtown into the final design of St. George's Square including but not limited to:
- Use of stone, wood, or other natural finishes where feasible; including the use of the limestone in the city’s salvaged material storage,
- Incorporation of heritage-inspired features such as: signage or art that shares local history and indigenous stories, gateway features such as low stone walls, or planters that tie the space to the downtown's historical context, planting and landscaping with native species and that soften hard surfaces, brick or stone paving patterns that reflect traditional streetscape.
- That the size of the area for play be reduced to include an interactive placemaking structure, and minimum safety clearance zones as defined by the Canadian Standards Association (CSA), in order to increase flexibility for programming and events within St. George's Square.
- That staff explore the inclusion of placemaking lighting within the design of the pavers or through the use of projectors throughout St. George’s Square including enhancing the proposed interactive placemaking structure.
- That staff explore modifying the size and materiality of the lower basin of the Family Fountain so that it is consistent with the design of St. George's Square, accommodates off-season intervention that contributes aesthetically to St. George's Square, includes placemaking lighting, and honours the integrity of the artwork.
- That staff provide council with final design updates (including a new main design image that can be used when sharing and telling the good news story about the redesign of our downtown) and present design details through future public engagement and online resources before the end of 2025.
- That staff report back on budget impacts, if applicable, associated with clauses 1 and 2, via either the 2026 budget monitoring process or the 2027 budget update.
- That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the delegation of authority by-law, By-law (2024) – 20994, be amended to delegate authority to the DCAO of Infrastructure, Development and Environment, with written approval from the City Treasurer, to modify the following user fees at various times as needed for the duration of the Downtown Infrastructure Renewal Program, with lost revenue being funded through the construction mitigation budget for the Downtown Infrastructure Renewal Program:
- Seasonal patio program parking stall rental fees
- Downtown hourly parking fees
- Encroachment agreement fees related to the Downtown Infrastructure Renewal Program
- That an amending by-law be brought forward for approval at the July 22, 2025, City Council meeting.
- That wherever possible, the sidewalk height and slope should be raised to increase front door accessibility to buildings.
- And that the final design for St. George's Square be brought forward for Council approval by the end of 2025.
Clause 3 of this motion was requested to be voted on separately.
Clause 1-2 and 4-8 of Main Motion, as amendedCarried (12 to 0)
Moved by Downer · Seconded by Busuttil
1. That the Downtown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025, be approved.
2. That the sequencing plan for Phase 1: Wyndham Street North Reconstruction including extended working hours, as outlined in report 2025-303, dated July 8, 2025, be approved.
4. That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.
5. That the delegation of authority by-law, By-law (2024) – 20994, be amended to delegate authority to the DCAO of Infrastructure, Development and Environment, with written approval from the City Treasurer, to modify the following user fees at various times as needed for the duration of the Downtown Infrastructure Renewal Program, with lost revenue being funded through the construction mitigation budget for the Downtown Infrastructure Renewal Program:
-
- Seasonal patio program parking stall rental fees
- Downtown hourly parking fees
- Encroachment agreement fees related to the Downtown Infrastructure Renewal Program
6. That an amending by-law be brought forward for approval at the July 22, 2025, City Council meeting.
7. That wherever possible, the sidewalk height and slope should be raised to increase front door accessibility to buildings.
8. And that the final design for St. George's Square be brought forward for Council approval by the end of 2025.
For (12): Mayor Guthrie, Gibson, Goller, Allt, Downer, Billings, Caron, Caton, Klassen, Richardson, Busuttil, Chew
Clause 3 of Main Motion, as amendedCarried (7 to 5)
Moved by Downer · Seconded by Busuttil
3. That the recommended Concept Plan for St. George’s Square, as outlined in report 2025-303, dated July 8, 2025, be approved including the following:
-
- That staff be directed to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events, including but not limited to:
- Consider that site furniture such as benches, chairs, and waste receptacles are designed and located to allow for easy reconfiguration or temporary removal to accommodate different uses and events.
- That staff be directed to integrate more natural materials and design elements that reflect the heritage and character of our downtown into the final design of St. George's Square including but not limited to:
- Use of stone, wood, or other natural finishes where feasible; including the use of the limestone in the city’s salvaged material storage,
- Incorporation of heritage-inspired features such as: signage or art that shares local history and indigenous stories, gateway features such as low stone walls, or planters that tie the space to the downtown's historical context, planting and landscaping with native species and that soften hard surfaces, brick or stone paving patterns that reflect traditional streetscape.
- That the size of the area for play be reduced to include an interactive placemaking structure, and minimum safety clearance zones as defined by the Canadian Standards Association (CSA), in order to increase flexibility for programming and events within St. George's Square.
- That staff explore the inclusion of placemaking lighting within the design of the pavers or through the use of projectors throughout St. George’s Square including enhancing the proposed interactive placemaking structure.
- That staff explore modifying the size and materiality of the lower basin of the Family Fountain so that it is consistent with the design of St. George's Square, accommodates off-season intervention that contributes aesthetically to St. George's Square, includes placemaking lighting, and honours the integrity of the artwork.
- That staff provide council with final design updates (including a new main design image that can be used when sharing and telling the good news story about the redesign of our downtown) and present design details through future public engagement and online resources before the end of 2025.
- That staff report back on budget impacts, if applicable, associated with clauses 1 and 2, via either the 2026 budget monitoring process or the 2027 budget update.
For (7): Mayor Guthrie, Gibson, Allt, Downer, Caron, Caton, Busuttil
Against (5): Goller, Billings, Klassen, Richardson, Chew
Approved Main Motion, as Amended
- That the Downtown Infrastructure Renewal Program Capital Implementation Plan, 2025, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the sequencing plan for Phase 1: Wyndham Street North Reconstruction including extended working hours, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the recommended Concept Plan for St. George’s Square, as outlined in report 2025-303, dated July 8, 2025, be approved including the following:
- That staff be directed to include flexibility in the design of St. George’s square to allow for present and future seasonal patios and community events, including but not limited to:
- Consider that site furniture such as benches, chairs, and waste receptacles are designed and located to allow for easy reconfiguration or temporary removal to accommodate different uses and events.
- That staff be directed to integrate more natural materials and design elements that reflect the heritage and character of our downtown into the final design of St. George's Square including but not limited to:
- Use of stone, wood, or other natural finishes where feasible; including the use of the limestone in the city’s salvaged material storage,
- Incorporation of heritage-inspired features such as: signage or art that shares local history and indigenous stories, gateway features such as low stone walls, or planters that tie the space to the downtown's historical context, planting and landscaping with native species and that soften hard surfaces, brick or stone paving patterns that reflect traditional streetscape.
- That the size of the area for play be reduced to include an interactive placemaking structure, and minimum safety clearance zones as defined by the Canadian Standards Association (CSA), in order to increase flexibility for programming and events within St. George's Square.
- That staff explore the inclusion of placemaking lighting within the design of the pavers or through the use of projectors throughout St. George’s Square including enhancing the proposed interactive placemaking structure.
- That staff explore modifying the size and materiality of the lower basin of the Family Fountain so that it is consistent with the design of St. George's Square, accommodates off-season intervention that contributes aesthetically to St. George's Square, includes placemaking lighting, and honours the integrity of the artwork.
- That staff provide council with final design updates (including a new main design image that can be used when sharing and telling the good news story about the redesign of our downtown) and present design details through future public engagement and online resources before the end of 2025.
- That staff report back on budget impacts, if applicable, associated with clauses 1 and 2, via either the 2026 budget monitoring process or the 2027 budget update.
- That the construction mitigation plan for Phase 1: Wyndham Street North Reconstruction, as outlined in report 2025-303, dated July 8, 2025, be approved.
- That the delegation of authority by-law, By-law (2024) – 20994, be amended to delegate authority to the DCAO of Infrastructure, Development and Environment, with written approval from the City Treasurer, to modify the following user fees at various times as needed for the duration of the Downtown Infrastructure Renewal Program, with lost revenue being funded through the construction mitigation budget for the Downtown Infrastructure Renewal Program:
- Seasonal patio program parking stall rental fees
- Downtown hourly parking fees
- Encroachment agreement fees related to the Downtown Infrastructure Renewal Program
- That an amending by-law be brought forward for approval at the July 22, 2025, City Council meeting.
- That wherever possible, the sidewalk height and slope should be raised to increase front door accessibility to buildings.
- And that the final design for St. George's Square be brought forward for Council approval by the end of 2025.